BIM based CAFM planning

(CAFM pre-design)

The deployment of a CAFM system to support a facility can begin before construction itself starts. This requires Building Information Modelling (BIM), completed during the building design process. The model created is perfectly suited to the task, replacing a building that does not yet exist in reality.

BIM models in the CAFM system

The BIM model provides an accurate and precise basis for a CAFM system. It can be loaded with alphanumeric data and can help you decide between different scenarios for the future building — for example how an office building should be allocated, or planning a cleaning protocol in advance.

BIM can simulate and optimise building design and construction processes using comprehensive digital models. This includes the building life cycle and operational details. Thanks to BIM models, detailed information on any building component can be obtained at any time.

Why is this useful for pre-designing facility management?

The BIM model provides a perfect basis during design and can be loaded into the CAFM system with alphanumeric data. This makes workflows faster and smoother, and offers clear options before planning decisions are made.

Once the BIM model is created and loaded into the CAFM system, it can be fully customised and adapted to your own requirements.

Benefits of combining BIM and CAFM

BIM, and the CAFM system built on top of it, supports design, prefabrication, engineering and quality control, construction coordination, digital handover, and facility management itself.

There is a live link between three-dimensional virtual models and planar drawings in BIM-based software. Whether in 2D plan views or 3D model views, edits are reflected across views.